New Zealand
View full profile

Scott Building Detailed Seismic Analysis

Scott Building Detailed Seismic Analysis

As a separable portion of a refurbishment contract for selected buildings in the University of Otago Medical School, CPG undertook a detailed seismic analysis using the New Zealand Society of Earthquake Engineering (NZSEE) procedure.

  • Client:University of Otago
  • Date:October 2008 - Ongoing
  • Location:Dunedin
  • Value:Confidential
View full profile

The Hunter Centre

The Hunter Centre

CPG were engaged as structural engineers for the extensive redevelopment of two existing two storey brick and concrete accommodation buildings owned by the University of Otago.

  • Client:University of Otago
  • Date:July 2008
  • Location:Dunedin, New Zealand
  • Value:NZ$7.8 Million
View full profile

8 Stafford Street

8 Stafford Street

Duffill Watts completed a seismic assessment and structural strengthening of a three storey Victorian brick warehouse with basement for redevelopment of the building into office space with new penthouse accommodation.

  • Client:Te Kawa Property Ltd.
  • Date:July 2007
  • Location:Dunedin, New Zealand
  • Value:NZ$750,000
View full profile

66 Vogel Street

66 Vogel Street

A seismic evaluation and a feasibility study were undertaken on this three storey unreinforced brick building dating from 1885, which utilises timber floors and internal steel columns and beams.

  • Client:JP Property Investment
  • Date:October 2007
  • Location:Dunedin, New Zealand
  • Value:NZ$300,000
View full profile

Telecom House

Telecom House

CPG designed 4 office buildings up to 7 stories in height over a common 3 level basement. The buildings are linked by a common glazed atrium and are designed to a 5 star green rating.

  • Client:Manson Developments
  • Date:Ongoing
  • Location:Auckland City
  • Value:NZ$80 Million
View full profile

Harbour Basin Redevelopment

Harbour Basin Redevelopment

The harbour redevelopment was an ORC 150th anniversary commemorative project to reinstate an old working wharf as a “peoples” wharf where people could go and enjoy themselves.

  • Client:Otago Regional Council
  • Date:2003
  • Location:Dunedin, New Zealand
  • Value:Confidential
View full profile

Liquefied Natural Gas Terminal at Port Taranaki

Liquefied Natural Gas Terminal at Port Taranaki

Two of New Zealand's largest power companies, Contact Energy and Genesis Power required a range of consulting services for the development of a new Liquefied Natural Gas (LNG) terminal to cater for New Zealand's growing energy needs.

  • Client:Contact Energy and Genesis Power
  • Date:February 2007
  • Location:New Plymouth, New Zealand
  • Value:Confidential
View full profile

Columba College Sports Centre

Columba College Sports Centre

CPG were tasked with the development of a world-class sports centre for Columba College in Dunedin, New Zealand.

  • Client:Columba College
  • Date:February 2006
  • Location:Dunedin, New Zealand
  • Value:NZ$2.7 Million
View full profile

Jacks Point Water Supply

Jacks Point Water Supply

To design and contract observation for the water supply of an 18 hole world class championship golf course.

  • Client:Jacks Point
  • Date:n/a
  • Location:Coneburn, New Zealand
  • Value:NZ$3.5 Million
View full profile

Fresh Water Basin

Fresh Water Basin

Following the award winning design of the tourist facilities in 1988, CPG were asked to upgrade the berths for the larger vessels using the harbour.

  • Client:Milford Sound Development Authority
  • Date:2004
  • Location:Milford Sound, New Zealand
  • Value:Confidential
A subsidiary of DownerEdi
CPG